CURRENT PROJECTS

The documents provided below relate to current projects published for public participation purposes. Note the respective closing dates for the proposed projects. Please either comment in writing, or request to be registered as an Interested and Affected Party, before the relevant closing date. Subsequent correspondence will only be distributed to I&APís on the registered list.

 

 

 

July 2017

PROJECT:

S24G Draft Environmental Impact Assessment Report. Rectification of unlawful infilling in a watercourse on Portion 18 of Farm 159, SALA, Durbanville

Project Leader: Johan Neethling

Closing date for comments: 21 August 2017

 

  Click on link to open document (...right click, 'Save Target As' to download document)

  Hoooggelegen Rd SALA S24G: Draft EIR

  Hooggelegen Rd SALA S24G Appendix A: Locality

  Hooggelegen Rd SALA S24G Appendix B1 Preferred Remedial Alternative

  Hooggelegen RD SALA S24G Appendix B2 Non-preferred Pond and Swale Existing Alignment

  Hooggelegen Rd SALA S24G Appendix B3 Non-preferred Pipe or Culvert in Existing Alignment

  Hooggelegen Rd SALA S24G Appendix C Infilling Photomontage

  Hooggelegen Rd SALA S24G Appendix D1 Biodiversity Overlay

  Hooggelegen Rd SALA S24G Appendix D2 Heritage Matters

  Hooggelegen Rd SALA S24G Appendix D3 Water and Sanitation Matters

  Hooggelegen Rd SALA S24G Appendix D4 Hydrology Notes

  Hooggelegen Rd SALA S24G Appendix E Official Correspondence

  Hooggelegen Rd SALA S24G Appendix F1 Public Participation Processs

  Hooggelegen Rd SALA S24G Appendix F2 Notice in TygerBurger

  Hooggelegen Rd SALA S24G Appendix F3 Site Notice

  Hooggelegen Rd SALA S24G Appendix F4 List of Identified I&AP's

  Hooggelegen Rd SALA S24G Appendix F5 Proof of Draft EIR to I&AP's

  Hooggelegen Rd SALA S24G Appendix F6 Proof Draft EIR to Organs of State

  Hooggelegen Rd SALA S24G Appendix G1 Wetland Assessment

  Hooggelegen Rd SALA S24G Appendix G2 Hydrological Report

  Hooggelegen Rd SALA S24G Appendix H EMP Draft

  Hooggelegen Rd SALA S24G Appendix J Title deed and ID

 

 

June 2017

PROJECT:

Draft Basic Assessment Report for Mixed Use Development (Stonewood Estate) on Erf 37119, Kraaifontein

Project Leader: Johan Neethling

Closing date for comments: 28 July 2017

 

  Click on link to open document (...right click, 'Save Target As' to download document)

  Stonewood: Draft Basic Assessment Report

  Stonewood Appendix A Locality

  Stonewood Appendix B1 Rejected SDP No 1

  Stonewood Appendix B2 Rejected SDP No 2

  Stonewood Appendix B3 Rejected SDP No 3

  Stonewood Appendix B4 Preferred SDP No 4 with odour line REV 20

  Stonewood Appendix C Photomontage

  Stonewood Appendix D1 Biodiversity Overlay

  Stonewood Appendix D2 Heritage Matters

  Stonewood Appendix D3 WUL approval from WAS

  Stonewood Appendix E Official Correspondence

  Stonewood Appendix F1 Public Participation Process

  Stonewood Appendix F2 Newspaper Notice

  Stonewood Appendix F3 Site Notice

  Stonewood Appendix F4 Register of Potential I and AP's

  Stonewood Appendix F5 Draft BAR Available for Potential I and AP's

  Stonewood Appendix F6 Draft BAR to Organs of State

  Stonewood Appendix G1 Extract from Northern Development Plan

  Stonewood Appendix G2 Engineering Services Report

  Stonewood Appendix G3 Transport Impact Assessment

  Stonewood Appendix G4 Botanical Report

  Stonewood Appendix G5 Lupo Application

  Stonewood Appendix G6 Architectural Guidelines

  Stonewood Appendix G7 Wetland Survey Report

  Stonewood Appendix G8 Air Quality Report

  Stonewood Appendix G9 Landscape Guidelines

  Stonewood Appendix G10 Storm Water Management

  Stonewood Appendix H Draft EMPr Construction and Operational Maintenance

  Stonewood Appendix I Stonewood TOR for EAP Basic Assessment

 

 

June 2017

PROJECT:

Draft Basic Assessment Report for Residential Development (Somerforest Estate) on Erf 7075, Somerset West

Project Leader: Johan Neethling

Closing date for comments: Monday 24 July 2017

 

  Click on link to open document (...right click, 'Save Target As' to download document)

  Somerforest Estate Draft Basic Assessment Report (Rev 2)

  Somerforest Estate Appendix A: Locality Plans

  Somerforest Estate Appendix B1 SDP Preferred

  Somerforest Estate Appendix B2 SDP Plan Non-preferred

  Somerforest Estate Appendix B3 SDP Non-preferred

  Somerforest Estate Appendix C Photomontage

  Somerforest Estate Appendix D1 Biodiversity Overlay

  Somerforest Estate Appendix D2 Water And Sanitation Matters

  Somerforest Estate Appendix E Engineering Services Capacity letter

  Somerforest Estate Appendix G1 FRESHWATER Report

  Somerforest Estate Appendix G2 Engineering Services Report

  Somerforest Estate Appendix G3 Landscape Guidelines

  Somerforest Estate Appendix G4 Storm Water Management

  Somerforest Estate Appendix G5 Architectural Guidelines

  Somerforest Estate Appendix G6 HOA Constitution

  Somerforest Estate Appendix G7 Floodlines

  Somerforest Estate Appendix G8 Building Platform Plan

  Somerforest Estate Appendix H Draft EMPr Construction and Operational

  Somerforest Estate Appendix I TOR EAP

  Somerforest Parel Vallei

  Click on link to open document (...right click, 'Save Target As' to download document)

  Parel Vallei Estate Draft Basic Assessment Report

  Parel Vallei Estate Appendix A: Locality Plans

  Parel Vallei Estate Appendix B1 SDP Preferred

  Parel Vallei Estate Appendix B2 SDP Plan Non-preferred

  Parel Vallei Estate Appendix B3 SDP Non-preferred

  Parel Vallei Estate Appendix C Photomontage

  Parel Vallei Estate Appendix D1 Biodiversity Overlay

  Parel Vallei Estate Appendix E Engineering Services Capacity letter

  Parel Vallei Estate Appendix G1 FRESHWATER Report

  Parel Vallei Estate Appendix G2 Engineering Services Report

  Parel Vallei Estate Appendix G3 Landscape Guidelines

  Parel Vallei Estate Appendix G4 Storm Water Management

  Parel Vallei Estate Appendix G5 Architectural Guidelines

  Parel Vallei Estate Appendix G6 HOA Constitution

  Parel Vallei Estate Appendix G7 Floodlines

  Parel Vallei Estate Appendix G8 Building Platform Plan

  Parel Vallei Estate Appendix G9 LUPO Application Somer Forest Report

  Parel Vallei Estate Appendix H Draft EMPr Construction and Operational

  Parel Vallei Estate Appendix I TOR EAP

 

 

March 2017

ENVIRONMENTAL AUTHORISATION

PROJECT:

Mixed Use Development on Portion 36 of Farm No 748, Klapmuts

Project Leader: Johan Neethling

 

  Click on link to open document (...right click, 'Save Target As' to download document)

  Klapmuts Mt Vernon Environmental Authorisation

 

 

November 2016

PROJECT:

Draft Environmental Impact Report for Mixed Use Development (De Hoop Lifestyle Estate) on Portion 1 of Farm No 838 and Rem of Farm No 893, Paarl

Project Leader: Johan Neethling

Closing date for comments:  Monday 12 December 2016

 

  Click on link to open document (...right click, 'Save Target As' to download document)

  De Hoop Final EIA Report

  De Hoop ROD EA full

  De Hoop: Draft Environmental Impact Report

  De Hoop: Appendix 1 Locality Plans

  De Hoop Appendix 2a Preferred SDP

  De Hoop Appendix 2b Rejected SDP

  De Hoop Appendix 3 Biodiversity overlay

  De Hoop Appendix 3.1 EMF Plans of EMZ1

  De Hoop Appendix 3.2 DSDF CBA Areas and Urban Infill Areas

  De Hoop Appendix 4 Vegetation Map

  De Hoop Appendix 5a Advert Placed in Newspaper

  De Hoop Appendix 5b Site Notices

  De Hoop Appendix 5c Inital List of Potrntial Interested and Affected Parties

  De Hoop Appendix 5d Background Information Document

  De Hoop Appendix 5e List of Registered I&AP's for Scoping

  De Hoop Appendix 6 Photomontage

  De Hoop Appendix 7 Official Correspondence from DEA&DP

  De Hoop Appendix 8 Proof of Notification of Availability of SR

  De Hoop Appendix 9 Botanical Report for the Site

  De Hoop Appendix 10 Botanical Report Bulk Services Routes

  De Hoop Appendix 11 Freshwater Assessment Reports

  De Hoop Appendix 12 Soil Survey Report

  De Hoop Appendix 13 Engineering Design Report

  De Hoop Appendix 13.1 Design Width of internal roads

  De Hoop Appendix 13.2 Capacity Analysis for Services for De Hoop GLS Report

  De Hoop Appendix 14 TIA Report

  De Hoop Appendix 15 Town Planning Report

  De Hoop Appendix 16 Stormwater Management Plan

  De Hoop Appendix 17 Heritage Matters

  De Hoop Appendix 18 Confirmation of Municipal Services Availability

  De Hoop Appendix 19 Bulk Services Planning

  De Hoop Appendix 19.1 EA issued for Pearl Valley Addtional Reservoir

  De Hoop Appendix 20 Electrical Bulk Service Servitude Plan

  De Hoop Appendix 21 Biodiversity Conservation Area

  De Hoop Appendix 22 Landscaping Plans

  De Hoop Appendix 23 Agricultural Matters

  De Hoop Appendix 24 Socio-economic Assessment

  De Hoop Appendix 25 Visual Statement

  De Hoop Appendix 26 Water Use Licence Matters

  De Hoop Appendix 27 Compliance with Appendix 6

  De Hoop Appendix 28 CV EAP Johan Neethling

  De Hoop Appendix 29 CV EAP Nadine Duncan

  De Hoop Appendix 30 Power of Attorney

  De Hoop Appendix 31 Comments and Responses Report on Scoping

  De Hoop Appendix 32 Comment Letters on Scoping Report

  De Hoop Appendix 33 EMPr Draft

  De Hoop Appendix 34 Maintenance Management Plan Aquatic Features

  De Hoop Appendix 35 I&AP's for DEIR

  De Hoop Appendix 36 Proof of DEIR to I&AP's

  De Hoop Appendix 37 Comments Letters on Draft EIR

  De Hoop Appendix 38 Comments and Responses Report on Draft EIR

   JNES Contact details...

   Calendar...

 

 

 

October 2016

PROJECT:

Formal Draft Basic Assessment Report for Dassenberg Leeu Estates Gabion Walls Farm 1551, Franschhoek.

Project Leader: Johan Neethling

Closing date for comments:  Monday 21 November 2016

 

  Click on link to open document (...right click, 'Save Target As' to download document)

  Dassenberg Leeu Estates Gabions: Formal Draft Basic Assessment Report

  Dassenberg Leeu Estates Gabions: Appendix A Locality Plans

  Dassenberg Leeu Estates Gabions Appendix B Scope of Work

  Dassenberg Leeu Estates Gabions Appendix C Photomontage

  Dassenberg Leeu Estates Gabions Appendix D1 Biodiversity Overlay

  Dassenberg Leeu Estates Gabions Appendix D2 Water and Sanitation WULA

  Dassenberg Leeu Estates Gabions Appendix E Official Correspondence

  Dassenberg Leeu Estates Gabions Appendix F1 Public Participation Processs

  Dassenberg Leeu Estates Gabions Appendix F2 News Paper Notices

  Dassenberg Leeu Estates Gabions Appendix F3 Site Notice

  Dassenberg Leeu Estates Gabions Appendix F4 Initial I&AP's

  Dassenberg Leeu Estates Gabions Appendix F5 Proof Draft BAR to I&AP's

  Dassenberg Leeu Estates Gabions Appendix F6 Comments letters on Draft BAR

  Dassenberg Leeu Estates Gabions Appendix F7 Comments & Responses Report on Draft BAR

  Dassenberg Leeu Estates Gabions Appendix F8 Registered I&AP's

  Dassenberg Leeu Estates Gabions Appendix G1 Wetland Assessment

  Dassenberg Leeu Estates Gabions Appendix G2 Engineering Scope of Work

  Dassenberg Leeu Estates Gabions Appendix G3 Hydraulogy Response Comments and Responses Report

  Dassenberg Leeu Estates Gabions Appendix G4 Engineering Specialist Studies

  Dassenberg Leeu Estates Gabions Appendix H EMPr Formal Draft Construction and Maintenance

  Dassenberg Leeu Estates Gabions Appendix I TOR EAP

   JNES Contact details...

   Calendar...

 

 

 

September 2016

PROJECT:

Basic Assessmnet Report for Wild Olive Farm Campsite on Portion 2 of Farm No 292, Paarl

Project Leader: Johan Neethling

Closing date for comments:  Friday 14 October 2016 2016

 

  Click on link to open document (...right click, 'Save Target As' to download document)

  Wild Olive Farm: Draft Basic Assessment Report

  Wild Olive Farm: Appendix A Locality Plans

  Wild Olive Farm: Appendix B Site Development Plan

  Wild Olive Farm: Appendix C Photographs

  Wild Olive farm: Appendix D Biodiversity Overlay

  Wild Olive Farm Appendix E Official Correspondence

  Wild Olive Farm Appendix F1 Public Participation Processs

  Wild Olive Farm Appendix F2 Newspaper Notice 1 Sept 16

  Wild Olive Farm Appendix F3 Site Notices at Gate on R301

  Wild Olive Farm Appendix F4 Initial I&AP's Final

  Wild Olive Farm Appendix F5 Proof of Draft BAR to I&AP's

  Wild Olive Farm Appendix G1 Engineering Services Report

  Wild Olive Farm Appendix G2 LUPO Report

  Wild Olive Farm Appendix H EMP Draft Construction

  Wild Olive Farm Appendix I Waste Act

  Wild Olive Farm Appendix J EAP TOR

   JNES Contact details...

   Calendar...

 

 

 

August 2016

PROJECT:

Scoping Report for Mixed Use Development on Portion 1 of Farm No 838 and Rem of Farm No 893, Paarl

Project Leader: Johan Neethling

Closing date for comments:  Monday, 12 September 2016

 

  Click on link to open document (...right click, 'Save Target As' to download document)

  De Hoop: Scoping Report

  De Hoop: Appendix 1 Locality Plans

  De Hoop: Appendix 2a Rejected SDP

  De Hoop Appendix 2a Preferred SDP

  De Hoop: Appendix 2b Preferred SDP

  De Hoop Appendix 2b Rejected SDP

  De Hoop Appendix 3 Biodiversity overlay

  De Hoop Appendix 4 Vegetation Map (from Fresh Water Study)

  De Hoop Appendix 5a Advert Placed in Newspaper

  De Hoop Appendix 5b Site Notices

  De Hoop Appendix 5c Inital List of Interested and Affected Parties

  De Hoop Appendix 5d Background Information Document

  De Hoop Appendix 6 Photomontage

  De Hoop Appendix 7 Notice of Intent to Develop Jul 16

  De Hoop Appendix 8 Acknowledge Receipt NOI

  De Hoop Appendix 9 Proof of Notification of Availability of SR

  De Hoop Appendix 10 Botanical Report

  De Hoop Appendix 11 Freshwater Assessment Report

  De Hoop Appendix 12 Soil Survey Report

  De Hoop Appendix 13 Engineering Design Report

  De Hoop Appendix 14 TIA Final Report

  De Hoop Appendix 15 Town Planning Report

  De Hoop Appendix 16 Stormwater Management Plan

  De Hoop Appendix 17.1 Heritage NID Form

  De Hoop Appendix 17.2 Heritage HWC ROD

  De Hoop Appendix 18 Confirmation of Services Availability

  De Hoop Appendix 19 External Pipelines Planning

  De Hoop Appendix 20 Electrical Servitude Plan

  De Hoop Appendix 21 Conservation Area

  De Hoop Appendix 22 Landscaping Plans

  De Hoop Appendix 23 Agriculture Matters

  De Hoop Appendix 24 Need and Desirability table as adapted from DEA&DP

  De Hoop Appendix 25 Artist Impression

  De Hoop Appendix 26 Compliance with Appendix 2

  De Hoop Appendix 27 Compliance with Appendix 6

  De Hoop Appendix 28 Application (new) 2016

  De Hoop Appendix 29 Water Use Licence Matters

  De Hoop Appendix 30 CV EAP Johan Neethling

  De Hoop Appendix 31 CV Nadine Duncan

  De Hoop Appendix 32 Power of Attorney

   JNES Contact details...

   Calendar...

 

 

 

July 2016

PROJECT:

BAR for Mixed Use Development on Portion 36 of Farm No 748, Klapmuts

Project Leader: Johan Neethling

Closing date for comments:  Thursday, 25 August 2016

 

  Click on link to open document (...right click, 'Save Target As' to download document)

  Klapmuts Mt Vernon: Basic Draft Assessment Report

  Klapmuts Mr Vernon: Appendix A Locality Plans link

  Klapmuts Mt Vernon Appendix B1 Alternative Layout Rejected

  Klapmuts Mt Vernon Appendix B2 Plan SDP Preferred

  Klapmuts Mt Vernon Appendix C Photographs

  Klapmuts Mt Vernon Appendix D1 Biodiversity Overlay

  Klapmuts Mt Vernon Appendix D2 Heritage Matters

  Klapmuts Mt Vernon Appendix D3 Water and Sanitation Matters

  Klapmuts Mt Vernon Appendix D4 WC Agric approval

  Klapmuts Mt Vernon Appendix E Official Correspondence

  Klapmuts Mt Vernon Appendix F1 Public Participation Processs

  Klapmuts Mt Vernon Appendix F2 Adverts in Eikestadnuus

  Klapmuts Mt Vernon Appendix F3 Site Notice

  Klapmuts Mt Vernon Appendix F4 Inital I&AP's

  Klapmuts Mt Vernon Appendix F5 Draft BAR to I&AP's

  Klapmuts Mt Vernon Appendix G1 Freshwater Ecological Assessment 261015

  Klapmuts Mt Vernon Appendix G2 Engineering Services Report

  Klapmuts Mt Vernon Appendix G3 Stormwater Report

  Klapmuts Mt Vernon Appendix G4 Traffic Inpact Sudy

  Klapmuts Mt Vernon Appendix G5 Soil Report

  Klapmuts Mt Vernon Appendix G6 Title deeds

  Klapmuts Mt Vernon Appendix G7 Power of Attorney

  Klapmuts Mt Vernon Appendix G8 Growth Model

  Klapmuts Mt Vernon Appendix G9 LUPO Application

  Klapmuts Mt Vernon Appendix H EMPr Draft Construction

  Klapmuts Mt Vernon Appendix I TOR EAP

   JNES Contact details...

   Calendar...

 

 

 

July 2016

PROJECT:

Revised BAR for Residential Development River Farm on Rem of Farm 1486, Paarl.

Project Leader: Johan Neethling

Closing date for comments:  Thursday, 4 August 2016

 

  Click on link to open document (...right click, 'Save Target As' to download document)

  River Farm: Revised Basic Assessment Report

  River Farm: Appendix A Locality Plans

  River Farm Appendix B1 Rejected Alternative 1

  River Farm Appendix B2 Rejected Alternative 2

  River Farm Appendix B3 Rejected Alternative 3

  River Farm Appendix B4 Rejected Alternative 4

  River Farm Appendix B5 Preferred alternative 5

  River Farm Appendix C Photomontage

  River Farm Appendix D1 Bio Diversity Overlay

  River Farm Appendix D2 Heritage Matters

  River Farm Appendix D3 Water and Sanitation Matters

  River Farm Appendix D4 Provincial Agricultural Approval

  River Farm Appendix E Official Correspondence

  River Farm Appendix F1 Public Participation Process

  River Farm Appendix F2 Newspaper Notice

  River Farm Appendix F3 Site Notices

  River Farm Appendix F4 Initial I&AP's

  River Farm Appendix F5 Proof of Draft BAR to I&AP's

  River Farm Appendix F6 Registered I&AP's

  River Farm Appendix F7 Comments on Draft BAR

  River Farm Appendix F8 Comments & Responses Report on Draft BAR

  River Farm Appendix F9 Revised BAR to Registered I&AP's

  River Farm Appendix F10 Comments on Revised BAR

  River Farm Appendix F11 Comments and Responses Report on Revised BAR

  River Farm Appendix G1 Fresh water assessment

  River Farm Appendix G2 Engineering Design Report

  River Farm Appendix G3 Botanical Asessement

  River Farm Appendix G4 Stormwater Management Plan

  River Farm Appendix G5 Traffic Impact Assessment Summary

  River Farm Appendix G6 Landscape Statement

  River Farm Appendix G7 LUPO Planning Report

  River Farm Appendix G8 Company resolution & Title Deeds

  River Farm Appendix H Revised EMPr

  River Farm Appendix I TOR EAP

   JNES Contact details...

   Calendar...

 

 

 

May 2016

PROJECT:

Mixed Use Development Durbell Stonewood on Erf 37119, Kraaifontein. Draft Basic Assessment report

Project Leader: Johan Neethling

Closing date for comments:  Monday, 20 June 2016

 

  Click on link to open document (...right click, 'Save Target As' to download document)

  Durbell Stonewood: Draft Basic Assessment Report

  Durbell Stonewood: Appendix A Locality Plans

  Durbell Stonewood: Appendix B1 Rejected Layout Alternative

  Durbell Stonewood: Appendix B2 Rejected Layout Alternative

  Durbell Stonewood: Appendix B3 Rejected Layout Alternative

  Durbell Stonewood: Appendix B4 Preferred Rejected Layout Alternative

  Durbell Stonewood: Appendix D1 Stonewood Bio overlay

  Durbell Stonewood: Appendix E Official Correspondence

  Durbell Stonewood: Appendix F1 Public Participation Process

  Durbell Stonewood: Appendix F2 Newspaper Notices

  Durbell Stonewood: Appendix F3 Site Notice

  Durbell Stonewood: Appendix F4 Register of Potential I&AP's

  Durbell Stonewood: Appendix F5 Initial Approach to Identified I&AP's

  Durbell Stonewood: Appendix F6 Draft BAR to I&AP's

  Durbell Stonewood: Appendix G1 Extract from Northern Development Plan

  Durbell Stonewood: Appendix G2 Engineering Services Report

  Durbell Stonewood: Appendix G3 Traffic Impact Report

  Durbell Stonewood: Appendix G4 Botanical Report

  Durbell Stonewood: Appendix G5 Lupo Application

  Durbell Stonewood: Appendix G6 Architectural Guidelines

  Durbell Stonewood: Appendix G7 Wetland Survey Report

  Durbell Stonewood: Appendix G8 Health Report

  Durbell Stonewood: Appendix G10 Storm Water Analysis

  Durbell Stonewood: Appendix G11 WWTW Setback Line

  Durbell Stonewood: Appendix G12 Access Roads

  Durbell Stonewood: Appendix H Draft EMPr Construction and Operational Maintenance

  Durbell Stonewood: Appendix I Stonewood TOR for EAP Basic Assessment

   JNES Contact details...

   Calendar...

 

 

 

APRIL 2016

PROJECT:

Residential Development River Farm on Rem of Farm 1486, Paarl.

Project Leader: Johan Neethling

Closing date for comments: Thursday, 20 May 2016

 

  Click on link to open document (...right click, 'Save Target As' to download document)

  River Farm: Draft Basic Assessment Report

  River Farm: Appendix A Locality Plans

  River Farm: Appendix B1 Rejected Layout Alternative

  River Farm: Appendix B2 Rejected Layout Alternative

  River Farm: Appendix B3 Rejected Layout Alternative

  River Farm: Appendix B4 Layout Plan Preferred

  River Farm: Appendix C Photomontage

  River Farm: Appendix D1 Biodiversity Overlay

  River Farm Appendix D2 Heritage Matters

  River Farm Appendix D3 Water and Sanitation Matters

  River Farm Appendix D4 Provincial Agricultural Approval

  River Farm Appendix E Official Correspondence

  River Farm Appendix F1 Public Participation Process

  River Farm Appendix F2 Newspaper Notice

  River Farm Appendix F3 Site Notices

  River Farm Appendix F4 Initial I&AP's

  River Farm Appendix F5 Proof of Draft BAR to I&AP's

  River Farm Appendix G1 Fresh water assessment

  River Farm Appendix G2 Engineering Design Report

  River Farm Appendix G3 Botanical Asessement

  River Farm Appendix G4 Stormwater Management Plan

  River Farm Appendix G5 Traffic Impact Assessment Summary

  River Farm Appendix G6 Landscape Statement

  River Farm Appendix H Draft EMPr

  River Farm Appendix I TOR EAP

   JNES Contact details...

   Calendar...

 

 

 

MARCH 2016

PROJECT:

S24G Rectification. Road on Portion 9 of Farm 487, Stellenbosch.

Project Leader: Johan Neethling

Closing date for comments: Thursday, 21 April 2016

 

  S24G Rectification. Road on Portion 9 of Farm 487, Stellenbosch. Trees Sa.

  DOCUMENTS

  Click on link to open document (...right click, 'Save Target As' to download document)

  Trees S24G Draft Environmental Impact Report

  Trees S24G: Appendix A Locality Plans

  Trees S24G: Appendix B Concept layout

  Trees S24G: Appendix C Photomontage

  Trees S24G: Appendix D1 Google route of road pre construction

  Trees S24G: Appendix D2 Google route of road pre construction

  Trees S24G: Appendix E1 Public Participation Processs

  Trees S24G: Appendix E2 Advert in Eikestadnuus

  Trees S24G: Appendix E3 Notice Board on Site

  Trees S24G: Appendix E4 Identified I&AP's

  Trees S24G: Appendix E5 Proof of Notices to Initial I&AP's

  Trees S24G: Appendix E6 Proof of delivery of draft EIR to Organs of State

  Trees S24G: Appendix F Correspondence and documents

  Trees S24G: Appendix G Heritage statement

  Trees S24G Appendix H EMP Draft

  Trees S24G Appendix J ID and Title Deeds

   JNES Contact details...

   Calendar...

 

 

 

FEBRUARY 2015

PROJECT:

Residential Development The Vines on Portion 12 Of Farm 826, Paarl.

Project Leader: Johan Neethling

Closing date for comments: Thursday, 5 March 2015

 

  Residential Development The Vines on Portion 12 Of Farm 826, Paarl.

  DOCUMENTS

  Click on link to open document (...right click, 'Save Target As' to download document)

  Val de Vie Extension The Vines: Final Basic Assessment Report

  Val de Vie Extension The Vines: Appendix A Locality Plans

  Val de Vie Extension The Vines: Appendix B1 Rejected Concept Layout

  Val de Vie Extension The Vines: Appendix B2 Rejected Layout 1

  Val de Vie Extension The Vines: Appendix B3 Rejected Alternative

  Val de Vie Extension The Vines: Appendix B4 Layout Plan Preferred

  Val de Vie Extension The Vines: Appendix B5 1988 Aerial Photo Mining Activity

  Val de Vie Extension The Vines: Appendix C Photomontage

  Val de Vie Extension The Vines: Appendix D1 Biodiversity Overlay

  Val de Vie Extension The Vines: Appendix D2 Heritage Matters

  Val de Vie Extension The Vines: Appendix E Official Correspondence

  Val de Vie Extension The Vines: Appendix F1 Public Participation Process

  Val de Vie Extension The Vines: Appendix F2 Newspaper Notices

  Val de Vie Extension The Vines: Appendix F3 Site Notices

  Val de Vie Extension The Vines: Appendix F4 Identified Interested and Affected Parties

  Val de Vie Extension The Vines: Appendix F5 Notices of Availability of Draft BAR to I&AP's

  Val de Vie Extension The Vines: Appendix F6 Comments and Responses Report on Draft BAR

  Val de Vie Extension The Vines Appendix F7 Registered I&AP's

  Val de Vie Extension The Vines: Appendix G1 Fresh Water Study

  Val de Vie Extension The Vines: Appendix G2 Engineering Services

  Val de Vie Extension The Vines: Appendix G3 HIA & VIA

  Val de Vie Extension The Vines: Appendix G4 Storm Water Management Report

  Val de Vie Extension The Vines: Appendix G5 Traffic Impact Report

  Val de Vie Extension The Vines: Appendix G6 Landscaping Report

  Val de Vie Extension The Vines: Appendix G7 Urban Design & Achitecture

  Val de Vie Extension The Vines: Appendix G8 Geotechnical Site Investigation

  Val de Vie Extension The Vines: Appendix G9 Planning Report

  Val de Vie Extension The Vines: Appendix H Draft EMP

  Val de Vie Extension The Vines: Appendix I Power of Attorney and Landowners Consent

  Val de Vie Extension The Vines: Appendix J EAP TOR

   JNES Contact details...

   Calendar...

 

 

 

MAY 2014

PROJECT:

Proposed communication mast and equipment building on portion 3 of Farm Welgevonden no. 218, Stellenbosch

Project Leader: Johan Neethling

Closing date for comments: Friday, 19 September 2014

 

  Proposed communication mast and equipment building on portion 3 of Farm Welgevonden

  no. 218, Stellenbosch

  DOCUMENTS

  Click on link to open document (...right click, 'Save Target As' to download document)

  Sterhuis: Final Basic Assessment Report

  Sterhuis: Appendix A Locality Maps

  Sterhuis: Appendix B1 Rejected Alternative

  Sterhuis: Appendix B2 Preferred Alternative

  Sterhuis: Appendix C Photomontage

  Sterhuis: Appendix D Biodiversity Summary Map

  Sterhuis: Appendix E1 Public Participation Process and BID

  Sterhuis: Appendix E2 Newspaper Advertisement

  Sterhuis: Appendix E3 Site Notice Boards

  Sterhuis: Appendix E4 Delivery of draft BAR to I&AP

  Sterhuis: Appendix E5 Registered Interested and Affected Parties

  Sterhuis: Appendix F Official Correspondence

  Sterhuis: Appendix G Specialist Reports

  Sterhuis: Appendix H Construction Environmental Management Programme

  Sterhuis: Appendix I EAP Terms of Reference

   JNES Contact details...

   Calendar...

 

 

 

OCTOBER 2014

PROJECT:

Industrial and Commercial Development on Remainder of Farm 1104 and Portion 9 of Farm 785, Firgrove.

Project Leader: Johan Neethling

Closing date for comments: Monday, 27 October 2014

 

  Industrial and Commercial Development on Remainder of Farm 1104 and Portion 9 of

  Farm 785, Firgrove.

  DOCUMENTS

  Click on link open document (...right click, 'Save Target As' to download document)

  Firgrove: Final Basic Assessment Report

  Firgrove: Appendix A Final BAR Locality Maps

  Firgrove: Appendix B1 Final BAR Rejected Layout 1

  Firgrove: Appendix B2 Final BAR Rejected Layout 2

  Firgrove: Appendix B3 Final BAR Rejected Layout 3

  Firgrove: Appendix B4 Final BAR Rejected Layout 4

  Firgrove: Appendix B5 Final BAR Preferred Layout

  Firgrove: Appendix B6 Final BAR Areas ceded to Roads Department

  Firgrove: Appendix C Final BAR Photographs

  Firgrove: Appendix D Final BAR Heritage Matters

  Firgrove: Appendix E Final BAR Official Correspondence, Approvals, Licenses, Permits

  Firgrove: Appendix F1 Final BAR Public Participation Process and BID

  Firgrove: Appendix F2 Final BAR Newspaper Notices

  Firgrove: Appendix F3 Final BAR Site Notice Boards

  Firgrove: Appendix F4 Final BAR Registered I&AP's

  Firgrove: Appendix F5 Final BAR Proof of BAR Forwarded to I&AP's

  Firgrove: Appendix F6 Final BAR Comments on Draft BAR

  Firgrove: Appendix F8 Final Bar Proof of Final BAR Forwarded to I&AP's

  Firgrove: Appendix G1 Final BAR Traffic Impact Assessment

  Firgrove: Appendix G2 Final BAR LUPO Appplication

  Firgrove: Appendix G3 Final BAR Geo-Technical Report

  Firgrove: Appendix G4 Final BAR Engineering Services Report

  Firgrove: Appendix G5 Final BAR Electrical Services Report

  Firgrove: Appendix G7 Final BAR Stormwater Management Plan

  Firgrove: Appendix G8 Final BAR Maintenance Agreement on Moddergat River

  Firgrove: Appendix H Final BAR Construction Environmental Management Programme

  Firgrove: Appendix I Final BAR Power of Attorney and Landowners' Consent

  Firgrove: Appendix J Final BAR EAP Terms of Reference & Time Schedule

  Firgrove: Appendix K Final BAR Application for Exemption

   JNES Contact details...

   Calendar...

 

 

 

JANUARY 2015

PROJECT:

Mixed use development on Portion 30 of Farm Langverwacht No 241, Kuils River

Project Leader: Johan Neethling

Closing date for comments: 9 February 2015

 

  Mixed use development on Portion 30 of Farm Langverwacht No 241, Kuils River

  DOCUMENTS

  Click on link to open document (...right click, 'Save Target As' to download document)

  Galencia Portion 30 of 241: Draft EIA Report
 
Galencia Portion 30 of 241: Appendix 1 Locality Plan
  Galencia Portion 30 of 241: Appendix 2 Letters from Authorities
  Galencia Portion 30 of 241: Appendix 3 Conceptual SDP
  Galencia Portion 30 of 241: Appendix 4 Photomontage
  Galencia Portion 30 of 241: Appendix 5 Botanical Report
  Galencia Portion 30 of 241: Appendix 6 Agricultural Potential Report
  Galencia Portion 30 of 241: Appendix 7 Scoping Comments and Responses report
  Galencia Portion 30 of 241: Appendix 8 Traffic Statement
  Galencia Portion 30 of 241: Appendix 9 Internal Services Report
  Galencia Portion 30 of 241: Appendix 10 External Services Report
  Galencia Portion 30 of 241: Appendix 11 Visual and Heritage Impact Report
  Galencia Portion 30 of 241: Appendix 12 Environmental Management Plan
  Galencia Portion 30 of 241: Appendix 13 Application for inclusion into Urban Edge

   JNES Contact details...

   Calendar...

 

 

 

PROJECT:

Oliphantskop Erf 6988, Langebaan, Mixed Use Development

Project Leader: Johan Neethling

Closing date for comments: 26 March 2012

 

If you wish to comment or register as an interested and affected party, kindly contact the Project Leader at the address below in writing:

Johan Neethling Environmental Services cc

P O Box 16594, Vlaeberg, 8018

Fax: 086 544 4868

Tel: (021) 461 4386

Cell: 083 449 3920

 

NB: The project reference number and your interest in the project